Anaerobic Digestion Plant, Aylesbury

Client: Buckingham Group Contracting Ltd

Project Value: £800k

T&C Construction Ltd carried out all in-situ concrete works on this high profile project for Buckingham Group Contracting Ltd. When fully operational the plant will convert food / organic waste into electricity which is transferred directly into the national grid.

Works involved construction of large in-situ structures including gas tank bases (each requiring approximately 350m3 of concrete) and other plinths. A large hopper pit was constructed which will be where the waste is deposited. The base of this structure is 5 metres below ground level. The base was poured in one continuous pour and required 400m3 of concrete. The structure involved 850m3 of concrete and 200t of reinforcement.

T&C also carried out installation of pile caps and ground beams, ground & first floor in-situ slabs, drainage works and a perimeter wall.

T&C Construction Services Ltd

Unit 120 K2 House
Heathfield Way
Northampton
NN5 7QP

Telephone: 01604 591692

info@tandccivils.com